Amplitude + Sketch Integration
Connecting Amplitude (analytics) and Sketch (design) reduces the gap between analytics and design in your team's daily workflow. There's no native connector, but both tools work with Zapier and Make — the workflow below covers the fastest path.
Integration Status
Via automation platform
No direct native connector between Amplitude and Sketch, but both tools support Zapier and Make. Most PM workflows can be replicated with a few zaps.
What teams use this integration for
Connect metrics to roadmap decisions
Embed Sketch charts and funnels alongside Amplitude roadmap items, so the data that drives a decision lives next to the decision itself. Useful for sprint reviews and quarterly planning.
Track feature impact after release
After shipping a feature from Amplitude, pull Sketch retention, activation, or conversion data into the same workspace to close the loop on impact — without exporting CSVs.
Embed designs in tasks
Link Sketch frames, prototypes, and design files directly to Amplitude tasks. Engineers get the spec alongside the ticket; PMs see design status without leaving the backlog.
Track design review as a workflow stage
Trigger Amplitude status changes when Sketch prototypes are marked ready for review. Keeps design and engineering in sync during handoff without manual status updates.
How to set it up
- In Amplitude settings, check the Integrations section for a direct Sketch connector (Amplitude supports 35+ native integrations — Sketch may be listed).
- If no native connector exists, open Zapier or Make and search for both Amplitude and Sketch. Both tools are likely available as triggers and actions.
- Choose your trigger: a common starting point is "New task in Amplitude" triggering an action in Sketch, or vice versa. Start with one automation before building a full workflow.
- Connect and authorise both accounts in the automation platform. Use accounts with the right workspace permissions — read access isn't enough for write actions.
- Run a test with a live item. Check that data maps correctly (task titles, assignees, due dates) and adjust field mappings before activating for the team.